Welcome to the steam and power forum, a bulletin board dedicated to questions and answers to Steam Plants and Power Generation Plants for steam boilers, turbine generator and heating problems. Dedicated to power plants, power generation, supercritical, and heating plants as well as steam boilers, steam turbine generators, gas turbines or combustion turbines, hrsg, steam heating, pressure vessels, steam line, including ASME questions and more. Remember the forum is made up of volunteers from experts to beginners. Unfortunately, we cannot allow free commercialism that promotes products, services, or sites.
 
The Steam Forum and Power Forum is being sponsored by the following:

Poppy   Steam Forum  

HP Heater Performance

Wednesday, June 28, 2017   By: India [1739] 1 Stars
Dear All

We have been operating a power plant of capacity 27 MW with a single HP Heater. The design data and the operating data for two days at a PLF of 103% is indicated in that table below.

Parameter Unit HPH -Design 24-Jun-17 25-Jun-17

Feed Flow rate through Heater TPH 111.88 115.02 116.53

Feed Water Pressure at Heater Inlet kg/cm2 130 124.57 125.12

Feed Water Inlet Temperature Deg C 176.2 177.69 178.02

Feed Water Pressure at Heater Outlet Deg C 129 123.99 124.53

Feed Water Outlet Temperature Deg C 235 230.47 230.85

Heater Shell Pressure kg/cm2 32.955 35.40 35.47

Temperature of Extraction Steam Deg C 387.3 396.6 396.9

Heater Drain Outlet Temperature Deg C 182.2 195.65 202.93

From the above data it is clear that we are not able to achieve the design outlet temperature of 235 Deg c. The heater has been cleaned , the end cover opened and checked for any leakage/bypass.

We are contemplating to even replace the Heater but not able to do so since we are not sure if the new one will help us to achieve. I would like to have your suggestions of what further checking needs to be done on the heater and also any designer who can vet my existing design and confirm the possibility of achieving the out let temperature.

Thanks in advance
Regards

Nachaippan

Post a Reply...
Viewed 1109 times

Wednesday, June 28, 2017   By: Ahsan [2077] 1 Stars
Dear Nachaippan,
According to Your provided data of 3 days Feed water outlet temperature is: 235, 230.47, 230.85 *C.
Isnt it very close to the design point 235 *C ?

Post a Reply...
Viewed 1080 times

Wednesday, June 28, 2017   By: Ross [390] 5 Stars
I think the layout meant to say the design is 235C and the 1st day is 230.47C and the next day the temperature is 230.85C.

Ross

Post a Reply...
Viewed 1080 times

Thursday, June 29, 2017   By: Ahsan [2077] 1 Stars
Oh! yes. My mistake.

Post a Reply...
Viewed 1025 times

Thursday, June 29, 2017   By: Jim Watts [764] 5 Stars
One of the biggest problems occurring in HP heaters is level control in the heater.
Your drain temperature variation over the two days indicates your level is not constant and is also low.
You should stabilize the heater level at its correct height and check performance again. The level will be about correct when the drain temperature is about design temperature.

Post a Reply...
Viewed 983 times

Tuesday, July 11, 2017   By: Nachiappan [1739] 1 Stars
We have tried changing the level in the Heater and the current level is the most optimum point Any increase or decrease in level was leading to lower temperatures ie. below 230 deg c.

Post a Reply...
Viewed 191 times

Wednesday, July 12, 2017   By: Jim Watts [764] 5 Stars
You cannot be at optimum as it is not a constant level. Your drain temperature should be the same all the time.

Post a Reply...
Viewed 163 times

Published on steamforum.com

 

Featured
Is Cp/Cv applicable to steam to calculate?
By: Kent mayhew [2161]

The reason that isobaric Cp heat capacity is greater than isometric Cv is that isobaric involves expansion. Remember our atmosphere has mass, so in order for a system to expand it must displace that mass. And this requires work. So Cp requires work plus the energy to heat the gas , while Cv only requires the energy to heat.

So for all gases and/or steam the work required to expand a given volume is the same that being the work required to displace our atmosphere by a given volume.

Hence t....   Read All
Armstrong International - Heat Exchange Stall
Advertising Info - Click Here!

It's hard not to look at this ad at least once, then you go to the next page an notice it again. Maybe you will not read the message, but you will be thinking about the brand and we call that brand impressions.

Imagine your static or animated display advertisement placed here, and if that is not enough you can include text too to expound on the virtues of your services and or products.    In addition, you can benefit by using our new advertisement feature to have your video included in your ad space.  Wow, make an infomerical with text and a display by combining all features to enhance the readers or audience's experience using your brand.  Ads can be much more than a static display ad. Here is an example of how your video could be used or position in this ad space:

 

Caption: This public domain video shows Heat Exchanger Stall: the What, Why, How, and When Heat Exchanger Stall occurs- Armstrong International Steam University.  The author of the video is not an advertiser and is being used to show how the video ad can be of value to the reader since you have already being viewing the video.  It is hard not to think about the authors brand after viewing the video ad.  This is the benefit of Branding.

Your advertisement impressions are genuine with removal of bots, crawls or spiders in your impression count, and we take it one step further, for hackers and malicious-padders get excluded when they are identified. 

 

 

A Long-Game that Earns Tomorrow's Sales


Click on this Promotional Advertisement to Contact Us Today!

Good Branding Puts Your Brand or Company in the Front of a Decision-Maker’s Mind for a Purchase either Months from Now or Five-Years in the Future.

Good branding makes your brand or company the leader in a crowded field of other brands or companies vying for your potential or existing client's attention. 

An invitation to the buyer's table to negotiate potential sales from $thousands to $millions of dollars in any of these: Systems sale, Capital Equipment, Upgrades & Modifications,  Repairs, or Capital Project becomes easier now with a recognized brand that thinks forward by brand advertising.

Your advertising will cost you an unbelievable low amount, so ask for our Media Kit that has Specs and Rates. 

Below is some of our demographic data for steam and power forum users will speak for itself:

Bus Sector Percent   Education Percent
Manufacturing 11%   College 51%
Power Gen 20%   Grad School 20%
Chemical & Petroleum 15%      
Medical Facilities 6%      
Pulp & Paper / Forest 7%      
Pharmaceutical 7%      

Our network works hard for you with placements for full coverage on part of the network, or full network placement.  Brand yourself today and don’t miss-out on being invited to your client or future client's table because they forgot you.  Be the leader they will remember and be part of their capital project.  Tomorrow’s clients are your future.

 

Advertising and Marketing Agency for the steam and power forum
PE Marketing, LLC

Branding.jpg

Sponsors/Advertisers
Industrial Training School - Maintenance
 
Industrial Training School - Steel Making Tutorial
 
Confidentiality, Disclaimer; Policy
STEAM and POWER FORUM
© 2001 to Steam Forum, All Rights Reserved.
PE Marketing LLC is representing the steamforum for advertising and marketing
Valid XHTML 1.0 Transitional